60-Day Vassar St Study by City of Orlando's Transportation Engineering Division


Full text taken from College Park Partnership's email newsletter

In an effort to determine the best solutions for traffic congestion on Edgewater Drive attributed to the Vassar Street intersection, Orlando's Transportation Engineering Division will be running a study at that location. 

For the first 30 days they have simply been monitoring the traffic conditions. The second 30-day period will involve implementing solution options and monitoring how these options effect traffic flow. 

See what the proposed traffic pattern changes will look like by viewing or downloading the PDF here.

One of the proposed options is to place barriers at the intersection to prevent left turns from Edgewater onto Vassar.