Orlando Main Street District Bicycle and Pedestrian Plan Study Project



A request for qualifications was issued by City Procurement on December 19, 2016 in an effort to find a consultant to provide professional engineering services to assist the City with its Orlando Main Street District Bicycle and Pedestrian Plan Study Project. You can read the whole RFP or just read the highlights below.

Related Stories:

From the RFP....
In 2009, responding to the downturn in the local economy, Mayor Buddy Dyer launched Strengthen Orlando, a comprehensive economic action plan to sustain communities and ensure that Orlando remains in position for future growth and prosperity. One main component of the comprehensive action plan was the promotion of the City’s Main Street Program. At its core, the Main Street Program strives to advocate a return to community self-reliance, local empowerment, and the rebuilding of traditional commercial districts based on their unique assets.

There are two main street districts that are associated with this study: Milk District and Mills 50. Each district has its own character, culture, architecture, infrastructure, and sense of community. These unique differences are favorable to businesses, citizens, and visitors in that they merge to enhance the overall environment for pedestrians, cyclists, and other commuters.

These main street districts however are not without faults or shortcomings. Like many main streets districts throughout the country, there is a desperate need to improve and provide additional roadway facilities, parking spaces, sidewalks, handicap ramps, street lighting, and bike lanes. This is vital to these communities considering the thousands—or hundreds of thousands—of pedestrians, cyclists, and motorists who venture in and out of these districts daily.

The issues become even more important when considering the proximity of these districts to high volume streets (pedestrian and vehicular), schools, hospitals, residential communities, parks and recreational facilities, and business districts—to include the Downtown Orlando Business District.

Considering the improvements needed, and the complexities associated with each district, this study aims to facilitate and implement a comprehensive streetscape study that will address the conceptual design, cost estimates, maintenance plan, corridor design criteria requirements, and jurisdictional issues unique to each main street district.

The ultimate goal will be to enhance the pedestrian and vehicular environment by addressing issues associated with the Americans with Disabilities Act (ADA), pedestrian environment, walkability, bikeability, and place-making. 

This project includes federal grant funding administered by the Florida Department of Transportation (FDOT), therefore, the successful consultant must be familiar with the Plans Preparation Manual and the Local Agency Program Manual.

Through this request, the City seeks to select a consulting team to provide assistance in planning, public involvement, permit coordination, survey, roadway design, structural/bridge design, cost estimates, and other services related to a comprehensive streetscape study. 

The professional services team may serve as an extension of City staff, who may also assist on the project. Therefore the professional services required may include, but may not necessarily be limited to the following:
  1. Transportation Planning and Design 
  2. Land Use Planning and Design
  3. Geographic Information Systems
  4. Graphic Design 
  5. Public Outreach and Coordination 
  6. Transportation Modeling 
  7. Spatial Analysis 
  8. Roadway Design 
  9. Structural/Bridge Design 
  10. Pedestrian and Bicycle Facilities Planning and Design 
  11. Stormwater/Drainage Design and Permitting 
  12. Environmental Consulting - Design, Permitting & Mitigation 
  13. Geotechnical Engineering - Soils Investigations, Pavement Design, etc. 
  14. Survey Services - Design Survey, Legal Descriptions & Right-of-Way Mapping 
  15. Utility Coordination 
  16. Traffic Engineering - Signals, Signs & Markings, and Maintenance of Traffic Plans 
  17. Coordination of roadway lighting with OUC

page13image2520
Action:
page13image3680 page13image3976 page13image4296 page13image4456
Date:
page13image5480 page13image6064 page13image6224
Legal Ad
page13image8000
December 18, 2016
page13image9312
RQS Released
December 19, 2016
page13image11952
Cut-off date for Questions by Respondents
page13image13208
On or before 5:00 p.m., local time, January 6, 2017
page13image15096
Last Addendum
page13image16384
On or before five (5) days prior to Qualification Statement Due Date
page13image17672 page13image18256
Qualification Statement Due Date and Time
January 19, 2017, @ 2:00 p.m., Local Time
1st Advisory Committee Meeting (Short-listing to at least Three (3) firms)
page13image22208
page13image22816
To Be Posted
2nd Advisory Committee Meeting (includes Presentations and Ranking of firms)
page13image25312
page13image25920
To Be Posted
City Council (Approval of Ranking and Negotiations)
page13image28216 page13image29016
April 10, 2017 (Estimated)
page13image29880 page13image30464
Negotiations Begin
page13image32104
After City Council approval of Ranking
page13image33456